Los Angeles sign permits: What the City Needs, How Long It Takes, Who Can Pull It
8511 Lankershim Blvd, Sun Valley · Open daily 7 AM–10 PM
Send the address. A person at our shop replies in writing: which city reviews your sign and what it usually asks for. Information, not an approval.

The short answer
Do I need a permit for a business sign?
In the City of Los Angeles, usually yes. A new sign, a change to an existing sign, a lit sign and removing a sign all need a sign permit. Temporary signs and banners need one too.
The common exception is a face change: new copy or a new face on an existing cabinet, with the cabinet left in place. If the cabinet comes off, the replacement is a new sign and has to meet today's code.
Sun Valley, North Hollywood, Van Nuys and Hollywood are in the City of LA. Burbank, Glendale and Pasadena are separate cities with their own rules (see permits by city).
City of Los Angeles: when a sign needs a permit
Usually needs a permit
- A new sign
- Changes to an existing sign
- Lit (illuminated) signs The permit is issued only to a C-10 or C-45 licensed contractor.
- Removing a sign
- A sign inside a mall
- Temporary signs, pennants and banners Up to 30 days, then 30 days off; 90 days a year at most.
Usually doesn't
- New face or copy on an existing cabinet Only while the cabinet stays in place.
- Small unlit ground signs 20 sq ft or less, under 6' 6" tall, no moving parts, at least 15 ft apart.
- Official and legal notices
- Temporary non-commercial signs An electrical permit is still needed if lit.
From the LADBS Sign Manual, P/BC 2023-078. General information for the City of Los Angeles, not an approval. Sign districts and landlord criteria can be stricter.
Check My Address
Helpful if you have it
- A straight-on photo of the wall
- Your landlord's sign criteria, if you rent
- A drawing or photo of the old sign, for a change or face swap
Text photos to (818) 806-9006 or email hello@angelsprint.com with the address in the subject.
How a sign permit works in the City of LA
-
Application and pre-inspection
A building (B) permit application plus a Sign Pre-Inspection (SPI) for each sign, with an 8½ × 11 plan per sign. Some wall signs far from a freeway skip the SPI (Sign Manual).Who Permit filer
-
Dimensioned plans
A plot plan with the lot, the buildings and every existing and proposed sign, plus elevations. Multi-tenant buildings can show tenant frontage and wall-sign area instead. ZIMAS screenshots don't count as a plot plan (LADBS correction sheet).Who Sign drawings: our shop
-
Structural calcs, if needed
Calculations stamped by a California engineer or architect. Not needed for wall signs under 100 sq ft or code-compliant projecting signs, unless the building is unreinforced masonry (Sign Manual).Who Engineer
-
Plan check
Simple scopes can go through PermitLA, others through ePlanLA. Both need an Angeleno account (LADBS).Who LADBS
-
Clearances, issuance, install
Apply for department sign-offs right away: some departments can take months to review a project. At issuance the contractor shows a notarized agent letter, workers' comp, a license copy and an LA Business Tax Registration Certificate (LADBS correction sheet). Then the sign goes up.Who City, then the licensed partner
How long does a sign permit take in LA?
| Feature | What LADBS says | Source |
|---|---|---|
| Sign Pre-Inspection | Normally takes at least two weeks. | LADBS FAQ |
| Plan check | Regular submittals normally take 15 to 30 business days just to be assigned to an engineer, or 6 to 10 if expedited. Estimates can change. | LADBS FAQ |
| Department clearances | Apply right away. Some departments can take months to review a project. | LADBS correction sheet |
| Application life | The application expires 18 months after plan-check submittal. | LADBS correction sheet |
| Face change only | No sign permit, so no permit wait, while the cabinet stays in place. | Sign Manual |
Burbank, Glendale and Pasadena run their own reviews with their own timelines. Landlord approval usually comes before any of these steps.
Who can pull it
Who can pull a sign permit in Los Angeles?
For lit signs, LADBS issues the permit only to a contractor with a C-10 (electrical) or C-45 (sign) license, and that licensee signs the application. The CSLB describes a C-45 sign contractor as one who fabricates, installs and erects electrical and non-electrical signs.
Hiring someone for sign work that needs a permit? California's $1,000 minor-work exemption doesn't apply to work that needs a permit (CSLB), so that person needs a contractor's license.
At Angels Signs, a licensed sign-contractor partner files the permit and installs the sign. We prepare the drawings and coordinate. Your quote lists the installer's CSLB license number, and you can look up any license on the CSLB website.
Who files the permit, who installs the sign, and what your quote lists.
Cases that change the rules
-
Near a freeway
Signs within 500 ft of a freeway and visible from it get an extra review. Within 2,000 ft, signs aimed mainly at the freeway are prohibited, apart from small identification and business wall signs. -
Digital displays
The property owner records a covenant. Messages change no faster than every 8 seconds, each message is static, and brightness may not change. -
Auto uses and mini-malls
Pole, projecting and roof signs need a Conditional Use Permit for automotive uses and mini-shopping centers. -
Sign districts
Areas like the Hollywood Signage Supplemental Use District have their own sign rules that override the general code. -
The new zoning code
Areas that adopted the city's new Chapter 1A zoning code, starting with Downtown, use its sign rules. Check which code applies to your parcel. -
Lit signs near homes
No lit wall sign may face a rear lot line within 30 ft of an R3 or more restrictive zone. Lit electric signs must also be listed under the National Electrical Code (NEC 600.3).
Landlord approval comes first
If you rent, your lease very likely makes any sign subject to the landlord's prior written approval. Shopping centers and office buildings usually have sign criteria: letter height, colors, lighting, mounting, and sometimes who may build the sign. Many ask for landlord-signed drawings before you apply to the city.
So the usual order is mockup, then landlord, then city. Once you approve your mockup, we prepare a dimensioned drawing of the sign on your building for the landlord, included with your quote. If someone files the permit as the owner's agent, LADBS asks for a notarized letter from the owner.
Los Angeles, Burbank, Glendale or Pasadena?
| City | Who reviews signs | What to know |
|---|---|---|
| City of Los AngelesSun Valley, North Hollywood, Van Nuys, Hollywood, Downtown | LADBS (Building and Safety). City Planning for sign districts, conditional use permits and special cases. | B-permit plus Sign Pre-Inspection. Lit signs only through a C-10 or C-45 licensee. A face change on an existing cabinet usually needs no permit. LADBS Sign Manual |
| Burbank | Planning Division first, then the Building Division. | Planning reviews sign applications first. The checklist asks for the application and a site plan, and incomplete submittals aren't accepted. Burbank sign checklist |
| Glendale | Community Development (sign programs and urban design), then Building and Safety. | Multi-tenant buildings often work under a sign program approved under GMC 30.33.220. Under a program, each sign is usually reviewed by the city's urban design or planning staff, and permits come from Building and Safety. Example approval |
| Pasadena | Planning: design review by staff or the Design Commission, depending on the sign. | A Master Sign Plan is required when six or more non-residential tenants share a property. Pasadena's sign code limits flush-mounted cabinet signs; we confirm the rules for your address. Pasadena design review |
Other cities nearby, such as Santa Clarita, San Fernando, West Hollywood and Beverly Hills, and unincorporated LA County areas like Altadena, have their own codes. Send the address and we'll tell you which one applies. Information, not an approval.
A person replies in writing. Information, not an approval.
How we help with your sign permit
-
Check the address
Which city reviews the sign, the zone, any sign district, and your landlord's criteria. Information, not an approval. -
Design to the rules
Your mockup is sized to what the city and the landlord usually allow, so you don't fall for a sign you can't put up. -
Prepare the drawings
The landlord drawing, then the sign permit drawings: plot plan information, elevations and sign details. -
Coordinate the filing
Our licensed partner files the permit and answers city corrections. We keep the drawings in step. Your quote lists the installer's CSLB license number.
Sign permit questions
Still deciding? Call (818) 806-9006 or text a photo and ask.
Do I need a permit for a business sign in Los Angeles?
How long does a sign permit take in LA?
Who can pull a permit for a lit sign?
How do I get a temporary sign or banner permit from the City of LA?
Does a restaurant need a sign permit in California?
Can I change the face of my old sign without a permit?
What goes into sign permit drawings?
How much is a sign permit fee in LA?
Does my landlord have to approve my sign?
Find out what your address allows
Free: 1 mockup + 1 round of changes per location for business-sign requests. Extra rounds are billed. Permit information is general, not an approval.
8511 Lankershim Blvd, Sun Valley, CA 91352Open daily 7 AM to 10 PMGet directions



